The Olive Tree, Shrewsbury.

Our team was initially contacted to carry out maintenance and explore reasons for the electrics tripping. Following multiple site visits and faults identified we were instructed to rewire the restaurant.

 

This was carried out during a shut down period of 2weeks working with the client to ensure the deadline was met and restaurant could reopen on time.

Heaven Skincare, Shifnal.

Full design and build M & E project undertaken to this new build industrial unit. The M&E was designed in house and in compliance with SBEM and Building Control.

 

Final vision was provided by the client on a mood board and our skilled team put together products and captured exactly what the client wanted.

 

The scheme was handed over on time and within budget.

Heaven Skincare, Shifnal.

Full design and build M & E project undertaken to this new build industrial unit. The M&E was designed in house and in compliance with SBEM and Building Control.

 

Final vision was provided by the client on a mood board and our skilled team put together products and captured exactly what the client wanted.

 

The scheme was handed over on time and within budget.

Critchill School, Frome.

We were appointed by R1 Construction to design, install and commission the full M&E package to a new SEN building.

 

The building had its challenges with it being of SIPS structure and the amount of services required however this was delivered to the same standard we expect on all projects.

We are delighted to see the children make use of this fantastic building in this well worthy project, giving the local community a school to be proud of. 

All Saints School, Sapcote.

Penguin were initially instructed to carry out some load tests as part of a feasibility study to determine whether the existing supplies had enough capacity for the proposed new building.

 

Following this, we were responsible for the full design and build of the mechanical and electrical systems including integration of security and data systems into the existing school building.